Cooling-pad maintenance should distinguish a media problem from a water-distribution problem. A dry area on the pad may need a different investigation from damaged media or an obstructed collection channel. Record the location and visible condition before cleaning so the original symptom is not lost.

Inspect the distribution pattern

Use the system's operating and inspection procedure to observe where water reaches the media. Note whether the condition affects one section, an edge or the full assembly. Identify the relevant supply and distribution components on the installation drawing.

Record recent changes such as cleaning, media replacement or work on the water system. An uneven pattern that began immediately after maintenance may have a different explanation from a gradually developing condition. Share that history when requesting technical support.

Hanging Evaporative Cooling Pad from the Famou Machinery equipment range.

Hanging Evaporative Cooling Pad from the Famou Machinery equipment range.

Follow the water return path

Check accessible collection and return components using the approved method. Look for an obstruction, leakage or a part that has moved from its intended position. Do not assume replacing the pad will correct a problem elsewhere in the circulation arrangement.

Where pumps or connected equipment need servicing, follow the isolation instructions. The pad, frame, pump and controls may require different procedures. Maintenance should address the identified component rather than applying one cleaning method to every part of the system.

Clean for the supplied media

Obtain the manufacturer's guidance on cleaning products, methods and any restrictions. Avoid unapproved pressure or chemicals that may damage media or other components. Record the product and method used so a later change in condition can be reviewed.

After cleaning, inspect media retention, joints and accessible distribution points. Replace damaged components with the specified references. Similar dimensions do not establish that a replacement pad has the same construction or operating characteristics.

Verify the result

  • Original symptom and affected section recorded.
  • Distribution and return path inspected.
  • Approved cleaning or repair action completed.
  • Relevant equipment restored according to its instructions.
  • Follow-up observation confirms the resulting condition.

Keep photographs before and after the work. They are useful when a condition returns and help distinguish an unresolved supply issue from new media damage. The maintenance record should describe actual observations rather than claim a restored cooling percentage without measurements of the complete system and its operating conditions.

Related equipment: Hanging Evaporative Cooling Pad, Cooling Pad with PVC Bottom Sump.

  • Get China Pig Farming Equipment

    Join Famou Machinery Newsletter to get more information about pig farming equipment

  • Subscribe to Our Blog

    We will never rent or sell your email to anyone.

  • Develop Pig Farming Business with Famou Machinery

    Contact Us Now