Home     /     Blog     /     Farrowing Crate Maintenance: Hinges, Feeders and Floor Supports
Famou Machinery By Famou Machinery

Farrowing crate maintenance should follow the parts that move, support loads or receive regular cleaning. A visual check of the main frame alone can miss a worn latch, loose trough bracket or damaged floor connection. Organise the inspection around those different functions and use the instructions for the supplied model.

Inspect moving parts through their intended travel

With the area made safe for inspection, examine hinges, gates and adjustment mechanisms. Check whether each moves and secures as intended. Identify wear, distortion or a component that no longer holds its position. Do not compensate for a damaged mechanism by forcing it into a different setting.

Record the crate location and part reference when reporting a defect. Similar-looking hinges or latches may differ between revisions. Photographs should show both the affected part and its position on the assembly so the replacement can be identified correctly.

Sow Farrowing Crate from the Famou Machinery equipment range.

Sow Farrowing Crate from the Famou Machinery equipment range.

Check feeders and floor interfaces separately

Inspect the trough attachments and the area around feed and water connections. Look for loose parts, damaged joints or access obstructed by an earlier modification. Follow the relevant isolation procedure before servicing connected equipment.

For the floor, check the visible panels, edges and retaining parts and review safely accessible supports. A cracked panel and a damaged support are different defects and may require different corrective work. Do not infer the condition of concealed supports from an apparently level top surface.

Use cleaning as an inspection opportunity

After cleaning by the approved method, inspect surfaces that were previously obscured. Note coating damage, rough edges and areas that retain material. Confirm cleaning-product compatibility rather than assuming every metal, plastic and seal in the crate tolerates the same treatment.

Lubrication, adjustments and part replacement should follow the manufacturer's instructions. Avoid assigning a universal lubricant or tightening value without knowing the component and its specification. The maintenance record should identify what was actually done.

Keep an actionable defect list

  • Crate number and component affected.
  • Condition observed and a clear photograph.
  • Immediate restriction on use, if required by the assessment.
  • Correct replacement or repair reference.
  • Completion date and return-to-service check.

Plan corrective work while the area can be accessed without disrupting animals or operators. After a repair, verify the affected function and neighbouring connections before returning the crate to use. A closed defect record should describe the completed action, not merely note that someone attended the room.

Related equipment: Sow Farrowing Crate.

  • Get China Pig Farming Equipment

    Join Famou Machinery Newsletter to get more information about pig farming equipment

  • Subscribe to Our Blog

    We will never rent or sell your email to anyone.

  • Develop Pig Farming Business with Famou Machinery

    Contact Us Now