Layer cage inspection should distinguish the wire or frame material, the coating description and the quality of the assembled joints. A finish named in a quotation does not replace inspection of the delivered cage, while a visual inspection alone cannot establish every material property.
Match the inspected unit to the order
Record the cage model, drawing revision and supplied configuration. Identify which components the material and coating statements cover. Cage wire, frame parts and purchased hardware may have separate specifications.
Where the order requires documented material or coating evidence, check that the documents refer to the supplied product. Do not transfer a specification from another model merely because both appear in the same catalogue. The Famou Machinery layer-cage ranges should be identified by their particular configuration when ordering.

Automatic Layer Cage System from the Famou Machinery equipment range.
Inspect joints and accessible edges
Examine representative welds, intersections and edge finishing on accessible parts. Look for damage or an unexpected condition and document it with a photograph that shows the location. A close photograph without a cage reference can be difficult to relate to the delivery later.
Check the connection between cage units and the support arrangement. Identify distorted parts or joints that do not fit as shown on the drawing. Ask the supplier to assess uncertain conditions before the installation team bends, cuts or modifies components.
Record handling damage separately
Transport or site handling can affect a component that was correctly manufactured. Inspect packaging contact points and parts exposed during unloading. Record the condition before assembly where possible, and agree the appropriate repair or replacement method.
Do not apply an unspecified surface repair product simply to make a damaged area look uniform. The corrective action should be compatible with the actual material and finish and follow the supplier's instructions.
Define the acceptance record
- Equipment reference and inspected delivery quantity.
- Material and coating documents required by the order.
- Locations inspected and observations made.
- Damaged or uncertain components identified for review.
- Agreed corrective action and its completion.
The purpose is a traceable receipt inspection, not an unsupported claim that a coating guarantees a particular service life. Keep operating and cleaning conditions with later maintenance records. If deterioration occurs, those records make it possible to review the component, its original specification and its exposure rather than relying on the broad label corrosion-resistant poultry cage.
Related equipment: Automatic Layer Cage System, A-Type Step-Style Layer Cage.




